Possible roads closed in Indiana: (more info from
INDOT)
Near
Frankfort. gross weight limit axle load limit Permanent Restriction. No gross vehicle weight exceeding 135,000 lbs. or individual axle weights exceeding 20,000 lbs. are permitted over the US 421 over South Fork Wildcat Creek (NBI 032200).
Near
Dayton until Nov 12. closed SR 38 is Closed to Thru Traffic from Conjunction Street East to Adams Road.
The road will be closed from 6 am April 4, 2022, until 6 pm November 12, 2022. The road is closed for pavement replacement and utility improvement
Near
Rensselaer starting Jun 30 until Jul 16. shoulder closed construction work width limit Contract B -40608 Work will be done in Jasper County Restriction on the NB on ramp of I-65 only. Any question call INDOT 855-463-6848
Near
Roselawn until Aug 4, 2023. rest area closed BUILDING AND PARKING LOT CLOSED
Near
Crown Point. permitted oversize loads prohibited width limit SR 55 between SR 2 and US 30
no vehicles wider than 10 ft due to the tight turns at the city square in Crown Point.
this is a permit restriction
Near
Merrillville until Oct 24. restrictions road construction Northbound curb side (right) lane closed for sidewalk and driveway construction.
Near
Gary until Jan 1, 2040. no overloads permitted oversize loads prohibited width limit Lake County -- SR 53 between I-80 and US 12 is restricted to oversize/overweight loads no vehicles wider that 12 ft.
This is a permit restriction
Near
Hammond until Jun 30. road construction County: Lake
Contract: R-42651
Route: US-20 (Michigan Avenue) From SR-912 (Cline Avenue) to SR-152 (Indianapolis Blvd.)
Construction: Preventive Maintenance, Patches & Resurface, placing stone along shoulder & guardrail, pavement marking
During construction flagger will be present and reduce to one lane between the hours of 6:00 AM to 7:00 PM (almost 13 hours) starting April 4th to June 30th
For Asphalt Patching on Ramps (SR-912 to US-20 EB/ WB & US-20 EB/WB to SR-912 NB/SB; US-20 EB/WB to Kennedy Avenue) Occasionally ramps will be closed for 4 to 5 hours.
Any questions please feel free to contract INDOT at 855-463-6848