Road conditions from Columbus to Kentucky

Grove City
clear sky    63°F
Clear Sky
Feels like 61.83
Wind speed 8.1 mph
Pressure 1016 hPa
Mount Sterling
clear sky    78°F
Clear Sky
Feels like 79.03
Wind speed 11.6 mph
Pressure 1013 hPa
Jeffersonville
clear sky    79°F
Clear Sky
Feels like 79.3
Wind speed 8.1 mph
Pressure 1014 hPa
Wilmington
clear sky    84°F
Clear Sky
Feels like 82.45
Wind speed 10.7 mph
Pressure 1012 hPa
Waynesville
clear sky    85°F
Clear Sky
Feels like 83.91
Wind speed 13.8 mph
Pressure 1011 hPa
Lebanon
scattered clouds    66°F
Scattered Clouds
Feels like 64.49
Wind speed 12.7 mph
Pressure 1028 hPa
Mason
scattered clouds    66°F
Scattered Clouds
Feels like 65.07
Wind speed 8.1 mph
Pressure 1032 hPa
Cincinnati
clear sky    68°F
Clear Sky
Feels like 67.53
Wind speed 10.4 mph
Pressure 1015 hPa
Covington
clear sky    69°F
Clear Sky
Feels like 68.58
Wind speed 10.4 mph
Pressure 1015 hPa
Florence
clear sky    68°F
Clear Sky
Feels like 67.73
Wind speed 7.2 mph
Pressure 1015 hPa
Independence
clear sky    68°F
Clear Sky
Feels like 68.13
Wind speed 6.8 mph
Pressure 1015 hPa
Williamstown
clear sky    69°F
Clear Sky
Feels like 69.44
Wind speed 5.8 mph
Pressure 1013 hPa
Georgetown
clear sky    67°F
Clear Sky
Feels like 67.14
Wind speed 0 mph
Pressure 1013 hPa
Lexington
clear sky    69°F
Clear Sky
Feels like 68.79
Wind speed 0 mph
Pressure 1013 hPa
Clark
broken clouds    79°F
Broken Clouds
Feels like 79.14
Wind speed 9.6 mph
Pressure 1011 hPa

Traffic from Columbus to Kentucky





Possible roads closed in Kentucky: (more info from KYTC)
Near Lexington. Work Zone Construction Activities. JACKS CREEK PIKE. Single lane traffic with alternating flow controlled by flaggers beetween Crawley Ln. and Shepard Ln. from 7 am to 5 pm on weekdays. Expect delays.
Near Williamstown. Work Zone Construction Activities. BARNES RD. Both directions blocked. Message boards are in place to notify the public. Motorists should seek an alternate route.
Near Georgetown. Work Zone Construction Activities. I-75. In both directions, the right lane is blocked. Expect delays. May 3- 4 and May 7 - 9 the road will be reduced to one lane in each direction from 7pm - 6am each night. Expect delays.
Near Florence. Work Zone Construction Activities. US-42. Lane blocked over I-75.

Possible roads closed in Ohio: (more info from ODOT)
Near Lebanon until Nov 30. Pavement repair and resurfacing project on state routes 48 and 122 in Warren County. Construction also includes resurfacing S.R. 48, between the Clermont County line and Foster Maineville Road and from Portland Boulevard, north of Miller Road, to S.R. 73 at Waynesville. The John R. Jurgensen Company was awarded a contract in the amount of $3 million to complete the project, and all work is scheduled to be completed in November 2023.
Near Waynesville until Jul 30. Rehab. bridge on S.R. 380 over Buck Run. (#22-569)
Near Wilmington until Aug 31. An intersection improvement and urban paving project on U.S. Route 22 (Rombach Avenue) in Wilmington. On Thursday, June 3, contractors for the Ohio Department of Transportation started construction of a two-part project that will rehabilitation and improve Rombach Avenue between Eastside Drive and the Wilmington corporation limit near the S.R. 73 interchange. The entire project, which is outlined over two parts, includes constructing a loon at Progress Way; improving the radius at Lowe's Drive; improving the signalization at Walmart Drive; reconstructing degraded portions of curb, walk, drainage structures and pavement; constructing approximately 4,800 feet of a shared-use path; and resurfacing nearly three miles of Rombach Avenue between Eastside Drive and the Wilmington corporation limit. During the first phase of the project, crews' efforts will be directed toward the storm sewer, water and sanitary lines, as well as pavement repairs and curb, sidewalk, and intersection work at Lowes Drive and Progress Way. The right lanes of Rombach Avenue will be closed in both directions through the work zone, and traffic will be maintained in one, 11-foot lane in each direction, and a two-way left-turn will also be maintained. The John R. Jurgensen Company was awarded a contract for approximately $9.3 million to complete the project, and all work is scheduled to be completed in late summer of 2023. 227(21)
Near Mount Sterling until Aug 15. The Woods Opossum Rd. bridge over I-71 will close starting Monday, May 15 for 90 days.  

From:
     

To:
     


Weather conditions:
Check road conditions from Columbus to Kentucky, or you can get reverse directions from Kentucky to Columbus. If you're trying to avoid mountains or steep grade roads, check the elevation profile from Columbus to Kentucky. Or if you are hungry, look for places to eat between Columbus and Kentucky. If you want to plan a road trip with stops along the way, you can view a full itinerary on Trippy.