Possible roads closed in Kentucky: (more info from
KYTC)
Near
Florence. Work Zone Construction Activities. US-42. Lane blocked over I-75.
Near
Williamstown. Work Zone Construction Activities. BARNES RD. Both directions blocked. Message boards are in place to notify the public. Motorists should seek an alternate route.
Near
Richmond. Traffic Roadway or Lane Blocking Incident. TATES CREEK AVE. Valley View Ferry closed due to maintenance.
Near
Mount Vernon. Work Zone Construction Activities. N WILDERNESS RD. Both directions expect single lane traffic between Lonzo Road and Grace Loop Road. Expect delays.
Possible roads closed in Ohio: (more info from
ODOT)
Near
Cleveland until Aug 31. Center St. bridge over the Cuyahoga River between Merwin Ave. and Riverbed St. will be closed through summer 2023, for bridge rehabilitation.
Near
Brunswick until Jun 30. U.S. 42 (Pearl Road) in the city of Brunswick, from Sleepy Hollow Road to Boston Road, will have lane closures for a minor rehabilitation project. The project includes the complete resurfacing and full depth repairs of U.S. 42, along with curb and sidewalk work.
NEW IMPACTS: Daily work zones, between SR 303 and Boston Road, will be set up to install loop detectors at various intersections. Traffic will be maintained at all times using flaggers or single lane closures. Work from Sleepy Hollow Road to SR 303 is anticipated to begin early April, weather depending.
Near
Wooster until Oct 31. SR 83, from just south of U.S. 30 to Milltown Road, will have daily lane closures for the removal and replacement of all existing full-depth pavement, shoulder widening, ramp improvements, and the roadway curvature on SR 83 northbound, south of SR 3 interchange, will be modified to improve sight distance.
NEW IMPACTS: The U.S. 30 eastbound exit ramp to SR 3/SR 83 north Medina/Lodi will close Wednesday, April 5 for repairs. The detour route will be for motorists to continue on U.S. 30 east to the Apple Creek Rd exit, turn left onto Apple Creek Rd and reenter onto U.S. 30 west, and travel U.S. 30 west to the SR 3/SR 83 North Medina/Lodi entrance ramp. This will be a single day closure and the road is expected to reopen the same day. The northbound passing lane will be closed Monday, April 10 with portable concrete barrier wall. The southbound driving lane will be closed Wednesday, April 12 with portable concrete barrier wall. The SR 83 southbound exit ramp to SR 585 Akron Road/Bowman St will close Wednesday, April 12 for 90 days for pavement repairs. The SR 585 (Akron Road) entrance ramp to SR 3/SR 83 south will close Wednesday, April 12 for 90 days for pavement repairs.
CONTINUING IMPACTS: The left lane in both directions is closed to work on the crossover area of the median wall. Traffic will be maintained in one 11¿ lane in each direction at all times and traffic will be separated by portable concrete barrier wall.
Near
Mansfield until Mar 31. State Route 39 in the city of Mansfield, between E. 6th Street and Lafayette Ave, will be reduced to one lane of traffic for a bridge replacement project.
NEW IMPACTS: The week of March 27, SR 39 will be reduced to one lane of traffic for water line work. Traffic will be maintained by portable traffic signals. SR 39, between 6th Street and Surrey Road/Lafayette Ave, is anticipated to close Monday, April 17 for 60 days for bridge demolition.
Near
Lebanon until Nov 30. Pavement repair and resurfacing project on state routes 48 and 122 in Warren County.
Work will resume in 2023.
Construction also includes resurfacing S.R. 48, between the Clermont County line and Foster Maineville Road and from Portland Boulevard, north of Miller Road, to S.R. 73 at Waynesville.
The John R. Jurgensen Company was awarded a contract in the amount of $3 million to complete the project, and all work is scheduled to be completed in November 2023.
Possible roads closed in Tennessee: (more info from
TDOT)
Near
Caryville until Sep 30. Interstate 75 northbound in Campbell County - At EXIT 134: US-25W / SR-63 / CARYVILLE-JACKSBORO-LA FOLLETTE, a widening project will cause temporary lane closures 24 hours daily. This work is expected to be completed by 09/30/2023.
Near
Gatlinburg until Apr 4. State Route 71 northbound in Sevier County - At BEECH BRANCH RD., maintenance work will result in lane closures 24 hours daily from 4:13PM, 01/03/2023 to 12:00AM, 04/04/2023 (Eastern Time Zone).