Possible roads closed in Indiana: (more info from
INDOT)
Near
Gulivoire Park until Nov 30. major road construction clearance work width limit speed restriction EventIcon US 31 between Kern Rd and US 20 (South Bend). Major road construction work is in progress. Clearance work is in progress. Speed restrictions are in force. There is a width limit in effect. Speed restrictions are in force. Height limit 14'6". Speed limit 35 MPH. Width limit 11'0". Until November 30, 2023 at about 6:00PM EST St. Joseph County
Contract:B-40600 DES: 1701538
US 31 and US 20 Interchange
New Bridge and Road Construction until fall of 2023
Current height restriction of 14'6" until fall of 2023
Starting March 27, 2023 traffic is restricted on US 31 between Johnson Road and Barbie Street. with a lane width of only 11 feet. The inside lanes are closed to construct temporary crossovers, and traffic will utilize the outside lanes. During that construction phase all ramps and loops will remain open.
On or after April 6, 2023 the southbound lane of US 31 will be transitioned to the inside lane, and the outside lane will be closed for Shoulder reconstruction. This will be done between Ireland Road and Johnson Road. During that phase all ramps and loops will remain open.
On or about April 19, 2023 all traffic will be switched to the southbound lanes of US 31 utilizing the new crossovers and the northbound lanes will be reconstructed. During this phase of construction northbound and southbound US 31 will be restricted to 11 foot lane width. While traffic is in the southbound lanes the loop for northbound US 31 traffic to northbound US 31 and westbound US 20 be closed and traffic will have to detour to SR 331 and back. Also the loop for eastbound on US 20 to northbound Michigan Street will be closed and traffic will also have to detour SR 331 and back.
Then mid-summer 2023 traffic will be switched to the newly constructed northbound lanes and the southbound lanes will be reconstructed.
Any Questions contact INDOT 855-INDOT-4-U
Near
South Bend. gross weight limit Permanent Restriction. No overweight loads are permitted over the bridge SR 933 over St. Joseph River (Leeper Park Bridge).
Near
Rochester until Jun 13. right shoulder closed speed restriction Speed restricted to 45 MPH.
Any questions, contact INDOT 855-463-6848
Near
Argos. width limit new road construction layout lane closed
Near
Grissom Air Force Base. gross weight limit width limit SR218 btw US 31 and SR 19 restricted to 10 foot wide and 80,000 lbs.
Near
Peru. width limit SR19 btwn 9th St and Harrison Ave restricted to 16 feet wide.
Near
Deming until Aug 31. bridge construction road construction intermittent lane closure
Near
Westfield. crash hazardous materials spill all lanes blocked
Near
Carmel until Oct 31, 2025. major road construction I-465 in both directions, between Exit 33: IN 431 and East 56th St (Indianapolis city (balance)). Look out for long term road construction work. Until October 31, 2025 at about 6:00AM EST.
Near
Lawrence until Oct 31, 2024. bridge construction Watch for bridge work on I-465 bridge over 71st Street. 71st Street is closed. See detour route for 71st Street. I-465 is not restricted by this work.
Near
Indianapolis. work on the shoulder Shoulders on the ramps will be closed for guardrail restoration on I 65 North and South bound between Capitol and Alabama streets.