Road conditions from Memphis to Chattanooga

Memphis
few clouds    62°F
Few Clouds
Feels like 60.28
Wind speed 15 mph
Pressure 1012 hPa
Arlington
overcast clouds    71°F
Overcast Clouds
Feels like 71.37
Wind speed 3 mph
Pressure 1007 hPa
Brownsville
scattered clouds    68°F
Scattered Clouds
Feels like 67.44
Wind speed 13.7 mph
Pressure 1010 hPa
Bells
broken clouds    68°F
Broken Clouds
Feels like 68.09
Wind speed 13.8 mph
Pressure 1009 hPa
Jackson
clear sky    60°F
Clear Sky
Feels like 58.62
Wind speed 12.7 mph
Pressure 1007 hPa
Lexington
overcast clouds    65°F
Overcast Clouds
Feels like 64.8
Wind speed 14.9 mph
Pressure 1009 hPa
Dickson
clear sky    64°F
Clear Sky
Feels like 61.97
Wind speed 17.3 mph
Pressure 1009 hPa
Fairview
overcast clouds    63°F
Overcast Clouds
Feels like 61.68
Wind speed 5 mph
Pressure 1009 hPa
Spring Hill
overcast clouds    63°F
Overcast Clouds
Feels like 61.88
Wind speed 8 mph
Pressure 1010 hPa
Franklin
overcast clouds    63°F
Overcast Clouds
Feels like 62.4
Wind speed 7 mph
Pressure 1009 hPa
Murfreesboro
clear sky    60°F
Clear Sky
Feels like 60.03
Wind speed 10.4 mph
Pressure 1009 hPa
Tennessee
overcast clouds    61°F
Overcast Clouds
Feels like 60.85
Wind speed 10.4 mph
Pressure 1008 hPa
Tullahoma
few clouds    61°F
Few Clouds
Feels like 60.96
Wind speed 6.9 mph
Pressure 1011 hPa
Monteagle
light rain    64°F
Light Rain
Feels like 61.34
Wind speed 2 mph
Pressure 1013 hPa
Kimball
moderate rain    68°F
Moderate Rain
Feels like 68.83
Wind speed 3 mph
Pressure 1010 hPa
Chattanooga
broken clouds    63°F
Broken Clouds
Feels like 62.83
Wind speed 10.4 mph
Pressure 1011 hPa

Possible roads closed in Tennessee: (more info from TDOT)
Near Monteagle until Jun 30. State Route 15 southbound in Grundy County - Between GRUNDY-MARION COUNTY LINE and FRANKLIN-GRUNDY COUNTY LINE , drainage work will result in a lane shift 24 hours daily. This work is expected to be completed by 06/30/2023.
Near Spring Hill until Jun 30, 2024. Interstate 65 both directions in Maury County - At EXIT 46: SR-99 / US-412 COLUMBIA / CHAPEL HILL, a widening project no delays 24 hours daily. This work is expected to be completed by 06/30/2024.
Near Jackson until Oct 31, 2024. Interstate 40 both directions in Madison County - Between MILE MARKER 82 (Mile Marker: 82) and MILE MARKER 88 (Mile Marker: 88), a widening project will result in lane closures every day. This work is expected to be completed by 10/31/2024.
Near Bells until Aug 31. Interstate 40 both directions in Haywood County - At EXIT 66: US-70, interchange modification construction will result in a lane shift 24 hours daily. This work is expected to be completed by 08/31/2023.
Near Brownsville until Jul 31. State Route 1 both directions in Haywood County - Between MORGAN ST. and COX LN., bridge repair will cause a reduction in lanes from two to one lane 24 hours daily. This work is expected to be completed by 07/31/2023.
Near Memphis until Feb 25, 2025. Interstate 55 both directions in Shelby County - Between EXIT 12: US-64 / US-70 / US-79 / EAST / CRUMP BLVD. and TENNESSEE-ARKANSAS STATE LINE, interchange modification construction will cause a reduction in lanes from three to two lanes every day. This work is expected to be completed by 02/25/2025.

From:
     

To:
     


Weather conditions:
Check road conditions from Memphis to Chattanooga, or you can get reverse directions from Chattanooga to Memphis. If you're trying to avoid mountains or steep grade roads, check the elevation profile from Memphis to Chattanooga. Or if you are hungry, look for places to eat between Memphis and Chattanooga. If you want to plan a road trip with stops along the way, you can view a full itinerary on Trippy.