Weather from Wichita to Kansas City (Kansas)

Wichita
light rain    69°F
Light Rain
Feels like 69.33
Wind speed 27.6 mph
Pressure 1014 hPa
Andover
clear sky    87°F
Clear Sky
Feels like 92.75
Wind speed 20.7 mph
Pressure 1016 hPa
Augusta
clear sky    87°F
Clear Sky
Feels like 91.54
Wind speed 17.3 mph
Pressure 1016 hPa
El Dorado
overcast clouds    74°F
Overcast Clouds
Feels like 74.64
Wind speed 11.5 mph
Pressure 1021 hPa
Emporia
few clouds    72°F
Few Clouds
Feels like 71.49
Wind speed 9.2 mph
Pressure 1021 hPa
Auburn
scattered clouds    71°F
Scattered Clouds
Feels like 71.15
Wind speed 4.6 mph
Pressure 1021 hPa
Topeka
clear sky    71°F
Clear Sky
Feels like 71.15
Wind speed 12.7 mph
Pressure 1021 hPa
Lawrence
clear sky    73°F
Clear Sky
Feels like 72.46
Wind speed 10.4 mph
Pressure 1021 hPa
Basehor
scattered clouds    76°F
Scattered Clouds
Feels like 77.65
Wind speed 12.8 mph
Pressure 1019 hPa
Shawnee
overcast clouds    74°F
Overcast Clouds
Feels like 73.69
Wind speed 15 mph
Pressure 1020 hPa
Kansas City
overcast clouds    75°F
Overcast Clouds
Feels like 74.3
Wind speed 15 mph
Pressure 1020 hPa

Possible roads closed in Kansas: (more info from KDOT)
Near Kansas City until Dec 30. exit ramp closed SB I-635 to SB K-5 into Fairfax is closed
Near Topeka until Nov 30. construction work entrance ramp closed A two-year, multi-bridge repair project on eastbound and westbound I-70, from MacVicar Avenue to California Avenue in Topeka, is scheduled to begin Monday, May 16, 2022, which is scheduled to be completed by November 2023. The project includes deck patching on the Polk-Quincy Viaduct, 3rd Street, and 4th Street bridges. Patching, overlay and other repairs will be completed on the bridges over the railroad tracks and Southeast Adams Street, located southeast of 10th Avenue. Speed will be reduced to 45 mph with an 11-foot-wide lane restriction in the work zone. The 4th Street on-ramp to eastbound I-70 will be closed for the duration of this year’s work, with other temporary ramp closures occurring as work progresses. Detours will be posted for motorists.
Near Emporia. right shoulder closed road construction The right shoulder of US-50 East will be closed through the south I-35 and US-50 roundabout in Emporia. This closure is due to construction work needed to tie the roundabout to new local streets being constructed south of the interchange. Work is expected to be complete by late summer.
Near Auburn. bridge construction This is a two-year project to re-deck and raise the vertical clearance of two bridges at mile markers 171.34 (Wannamaker Road) and 172.477 (69th Street) on I-335/KTA in Shawnee County. Reconstruction of the Wannamaker Road bridge / 2021, followed by the 69th Street bridge / 2022.
Near Andover. long term road construction Construction of five sets of cashless toll zones from MM 56.4 to 122.9 on I-35/KTA and extension of a 12’x13’ reinforced concrete box drainage structure at MM 96.33. This work is the second set of cashless tolling zones to be constructed on the Kansas Turnpike for its conversion to cashless tolling in 2024.

From:
     

To:
     


Weather conditions:
Check road conditions from Wichita to Kansas City (Kansas), or you can get reverse directions from Kansas City (Kansas) to Wichita. If you're trying to avoid mountains or steep grade roads, check the elevation profile from Wichita to Kansas City (Kansas). Or if you are hungry, look for places to eat between Wichita and Kansas City (Kansas). If you want to plan a road trip with stops along the way, you can view a full itinerary on Trippy.