Dent (Ohio) Road Conditions

Oakbrook
few clouds    74°F
Few Clouds
Feels like 72.45
Wind speed 10.4 mph
Pressure 1011 hPa
White Oak
haze    74°F
Haze
Feels like 72.43
Wind speed 10.4 mph
Pressure 1010 hPa
Cincinnati
haze    75°F
Haze
Feels like 73.22
Wind speed 8.1 mph
Pressure 1001 hPa
Fairfield
clear sky    75°F
Clear Sky
Feels like 73.53
Wind speed 6.9 mph
Pressure 1011 hPa
Forest Park
clear sky    74°F
Clear Sky
Feels like 72.68
Wind speed 6.9 mph
Pressure 1011 hPa
Villa Hills
haze    74°F
Haze
Feels like 72.57
Wind speed 10.4 mph
Pressure 1010 hPa
Wilder
haze    74°F
Haze
Feels like 73.06
Wind speed 10.4 mph
Pressure 1010 hPa
Taylor Mill
haze    74°F
Haze
Feels like 72.68
Wind speed 10.4 mph
Pressure 1010 hPa
Southgate
haze    74°F
Haze
Feels like 72.61
Wind speed 10.4 mph
Pressure 1001 hPa
Newport
haze    75°F
Haze
Feels like 73.62
Wind speed 10.4 mph
Pressure 1002 hPa
Park Hills
haze    74°F
Haze
Feels like 72.79
Wind speed 10.4 mph
Pressure 1010 hPa
Ludlow
haze    75°F
Haze
Feels like 73.31
Wind speed 10.4 mph
Pressure 1010 hPa
Hebron
few clouds    74°F
Few Clouds
Feels like 72.37
Wind speed 10.4 mph
Pressure 1011 hPa
Elsmere
haze    74°F
Haze
Feels like 72.34
Wind speed 10.4 mph
Pressure 1011 hPa
Lakeside Park
haze    74°F
Haze
Feels like 72.37
Wind speed 10.4 mph
Pressure 1010 hPa
Florence
few clouds    74°F
Few Clouds
Feels like 72.32
Wind speed 10.4 mph
Pressure 1011 hPa
Highland Heights
haze    74°F
Haze
Feels like 72.32
Wind speed 10.4 mph
Pressure 1010 hPa
Fort Mitchell
haze    74°F
Haze
Feels like 72.39
Wind speed 10.4 mph
Pressure 1010 hPa
Fort Wright
haze    74°F
Haze
Feels like 72.52
Wind speed 10.4 mph
Pressure 1010 hPa
Crescent Springs
haze    74°F
Haze
Feels like 72.68
Wind speed 10.4 mph
Pressure 1010 hPa
Crestview Hills
haze    74°F
Haze
Feels like 72.5
Wind speed 10.4 mph
Pressure 1010 hPa
Covington
haze    75°F
Haze
Feels like 73.78
Wind speed 10.4 mph
Pressure 1000 hPa
Edgewood
haze    74°F
Haze
Feels like 72.28
Wind speed 10.4 mph
Pressure 1010 hPa
Burlington
few clouds    74°F
Few Clouds
Feels like 72.61
Wind speed 10.4 mph
Pressure 1011 hPa
Erlanger
haze    74°F
Haze
Feels like 72.3
Wind speed 10.4 mph
Pressure 1011 hPa
Norwood
haze    71°F
Haze
Feels like 69.67
Wind speed 4 mph
Pressure 1002 hPa
Woodlawn
haze    71°F
Haze
Feels like 69.84
Wind speed 5.8 mph
Pressure 1012 hPa
Wyoming
haze    72°F
Haze
Feels like 70.02
Wind speed 5.8 mph
Pressure 1011 hPa
North College Hill
haze    71°F
Haze
Feels like 69.08
Wind speed 5.8 mph
Pressure 1012 hPa
Saint Bernard
haze    71°F
Haze
Feels like 69.93
Wind speed 11.5 mph
Pressure 1003 hPa
Springdale
clear sky    71°F
Clear Sky
Feels like 69.51
Wind speed 5.8 mph
Pressure 1011 hPa
Glendale
haze    71°F
Haze
Feels like 69.91
Wind speed 5.8 mph
Pressure 1011 hPa
Elmwood Place
haze    72°F
Haze
Feels like 70.02
Wind speed 5.8 mph
Pressure 1006 hPa
Greenhills
clear sky    71°F
Clear Sky
Feels like 69.21
Wind speed 5.8 mph
Pressure 1012 hPa
Hamilton
haze    71°F
Haze
Feels like 69.78
Wind speed 11.5 mph
Pressure 1010 hPa
Lockland
haze    72°F
Haze
Feels like 70.05
Wind speed 5.8 mph
Pressure 1011 hPa
Lincoln Heights
haze    72°F
Haze
Feels like 70
Wind speed 5.8 mph
Pressure 1011 hPa
Finneytown
haze    71°F
Haze
Feels like 68.86
Wind speed 5.8 mph
Pressure 1011 hPa
Mount Healthy
haze    71°F
Haze
Feels like 69.04
Wind speed 5.8 mph
Pressure 1012 hPa
Dayton
haze    71°F
Haze
Feels like 69.8
Wind speed 11.5 mph
Pressure 1003 hPa
Northgate
clear sky    55°F
Clear Sky
Feels like 53.46
Wind speed 1 mph
Pressure 1011 hPa
Miami Heights
clear sky    56°F
Clear Sky
Feels like 54.07
Wind speed 6.9 mph
Pressure 1010 hPa
Skyline Acres
haze    55°F
Haze
Feels like 53.6
Wind speed 1 mph
Pressure 1011 hPa
Miamitown
clear sky    56°F
Clear Sky
Feels like 54.93
Wind speed 6.9 mph
Pressure 1010 hPa
Ross
clear sky    56°F
Clear Sky
Feels like 54.61
Wind speed 0 mph
Pressure 1011 hPa
Monfort Heights
haze    55°F
Haze
Feels like 53.62
Wind speed 6.9 mph
Pressure 1010 hPa
Mack
clear sky    56°F
Clear Sky
Feels like 53.89
Wind speed 6.9 mph
Pressure 1010 hPa
Northbrook
clear sky    55°F
Clear Sky
Feels like 53.67
Wind speed 1 mph
Pressure 1011 hPa
Harrison
clear sky    56°F
Clear Sky
Feels like 54.55
Wind speed 5 mph
Pressure 1010 hPa
Cleves
clear sky    56°F
Clear Sky
Feels like 54.81
Wind speed 6.9 mph
Pressure 1010 hPa


Traffic conditions around Dent (Ohio)





Possible roads closed in Indiana: (more info from INDOT)
Near Harrison. gross weight limit axle load limit Permanent Restriction. No gross vehicle weight exceeding 135,000 lbs. or individual axle weights exceeding 20,000 lbs. are permitted over the bridge SR 46 over Whitewater River (NBI 17540).

Possible roads closed in Kentucky: (more info from KYTC)
Near Oakbrook. Work Zone Construction Activities. BURLINGTON PIKE. Both directions reduced to one lane between Ridge Rd. and KY 842 (Houston Rd) from 6 pm to 6 am nightly. Expect delays.
Near Hebron. Hazard Roadway or Lane Blocking Incident. I-275 RAMP from KY 237. May be viewed on CCTV_06_275_0070.
Near Elsmere. Work Zone Construction Activities. MOUNT ZION RD. Lane blocked for roundabout construction at the intersection of Mt. Zion Rd. and Sigmon Lane.
Near Florence. Work Zone Construction Activities. US-42. Lane blocked over I-75.
Near Fort Wright. Work Zone Construction Activities. MADISON PIKE. Both directions left lane blocked from 9 am to 3 pm daily.
Near Crescent Springs. Work Zone Construction Activities. BROMLEY-CRESCENT SPRINGS RD. Both directions all lanes blocked from 8 AM to 4 PM daily. Seek alternate route.
Near Edgewood. Work Zone Construction Activities. STEVENSON RD. Both directions expect blocked lanes and delays.
Near Burlington. Work Zone Construction Activities. BURLINGTON PIKE. Both directions expect delays and shutdowns of 15 minutes between Caroline Williams Way and Saddle Ridge Drive daily 7a.m. - 4p.m.
Near Erlanger. Work Zone Construction Activities. DONALDSON HWY. In both directions of Donaldson Pike (KY 236) between KY 842 (Houston Rd) and KY 3076 (Mineonla Pike) expect blocked lanes and delays. Watch for flaggers.

Possible roads closed in Ohio: (more info from ODOT)
Near Newport until Oct 31. Bridge rehabilitation project on E. McMillan Street over U.S. Route 42 (Reading Road). On Monday, June 12, the right two lanes on McMillan Street, between Symmes Street and the on-ramp to I-71 North, will be closed from 7 a.m. to 6 p.m. Lane restrictions may also be in effect on Burnet Avenue at the overpass. Contractors working for the Ohio Department of Transportation will close a lane on southbound Burnet Avenue under E. McMillan Street daily from 9 a.m. to 4 p.m. while crews continue work on the bridge. Also, one lane remains closed on E. McMillan Street. The entire project calls for replacing pier pylons and lighting, repairing the substructure, replacing abutment bearings, painting structural steel, resurfacing the bridge deck and other preservation items of the McMillan Street bridge. Prus Construction Company was awarded a contract for approximately $1.63 million to complete the project, and all work is scheduled to be completed in the summer of 2024. (22-485)
Near Ludlow until Sep 30. I-75 Resurfacing - Following a winter hiatus, operations will resume this week for a resurfacing project on Interstate 75 between the Brent Spence Bridge approach and the Western Hills Viaduct. Sunday-Friday, June 4-9: Lane closures will be in effect on I-75 South between the bridge and Harrison Avenue from 7 p.m. each night to 6 a.m. the following day. Various ramp closures may also be in effect during the overnight hours. Barrett Paving Materials, Inc., was awarded the $8.6 million project, and all work is scheduled to be completed by late summer.
Near Springdale until Jun 30. Pavement repair and paving project on Interstate 275 between east of Winton Road and just west of the I-75 interchange. The John R. Jurgensen Company was awarded a contract for $2.9 million to complete the project, and all work is scheduled to be completed in the summer of 2023. (#21-128)
Near Glendale until May 30, 2025. Interstate 75/Thru the Valley mega project. Wednesday, June 7: Close the right lane on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 8 p.m. and 6 a.m. Thursday, June 8. Close the ramp from Sharon Road to I-75 North between 10 p.m. and 5 a.m. Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 10 p.m. and 5 a.m. Traffic will be maintained with law enforcement officers. Thursday, June 8: Close the ramp from I-75 North to the I-275 East and West ramp between 10 p.m. and 5 a.m. Friday, June 9. During closure, traffic will be detoured via the Union Centre Road ramp back to I-75 South to I-275. Close the right lane on I-75 North from Sharon Road to the I-275 ramp between 8 p.m. and 6 a.m. Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 10 p.m. and 5 a.m. Traffic will be maintained with law enforcement officers. Thursday and Friday, June 7 & 8: Close the ramp from Sharon Road to I-75 North, and the ramp from I-75 North to Sharon Road, each night between 10 p.m. and 5 a.m. the following day. The ramps will not be closed at the same time. Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, each night between 10 p.m. and 5 a.m. the following day. Traffic will be maintained with law enforcement officers. (#21--43)
Near Hamilton until Sep 1, 2025. Phase 5B of the I-75/I-74 Mill Creek Expressway. Wednesday, June 7: Single-lane closures on I-75 North and South, between Mitchell Avenue and Hopple Street, from 8 p.m. to 6 a.m. Thursday, June 8. Thursday, June 8: Single-lane closure on I-75 North, from Hopple Street to Mitchell Avenue, between 8 p.m. and 6 a.m. Friday, June 9. Single-lane closure on I-74 East, from Montana Avenue to I-75 South, between 8 p.m. and 6 a.m. Friday and Saturday, June 9 & 10: Single-lane closure on I-74 East, from Montana Avenue to I-75 South, each night between 8 p.m. and 6 a.m. the following day. The total project will reconfigure the I-75 South connection to I-74 East and perform additional improvements to the eastbound I-74 connections to I-75. During the initial phase of construction roadway, drainage and lighting improvements will be made on Borden Place, Powers Street, King Place, Elmore Street and Prang Street adjacent to I-74. As part of this phase of construction, the following changes will be implemented: Borden Pl. will be converted to a cul-de-sac. Powers St. will be eliminated between Borden Pl. and King Pl. The intersection of Powers St. and King Pl. will be reconfigured. Powers St. will be extended to tie into Colerain Ave. Prang St. will be relocated to the east. The Great Lakes Construction Company was awarded the $85 million contract, and all work is scheduled to be complete by late summer 2025. (203000)
Near Lockland until Aug 1. SRTS - repair sidewalks and ADA ramps, pedestrian upgrades, etc., Wyoming Avenue in the village of Lockland. (22-547)
Near Miamitown until Oct 15. Resurface portions of I-74 and I-275. Paving operations on the Interstate 74/I-275 resurfacing project requires an overnight ramp closure tonight. On Friday, June 2, the ramp from Kilby Road to northbound I-275 will be closed between 9 p.m. and 5 a.m. Saturday, June 3. During closure, traffic can use U.S. 50 and S.R. 128 to I-74 or Kilby Road to I-74. The project includes pavement repairs and resurfacing I-74 from the Dry Fork Road interchange to just west of the Hamilton/Cleves Road interchange, as well as I-275, between its junction with I-74 and the Kilby Road interchange. The project also includes minor bridge work at structures on I-74. Contractors for the Ohio Department of Transportation will impart single-lane closures on I-74, and traffic will be maintained in one lane on weekdays, Monday through Friday, from 8 p.m. each night to 6 a.m. the following day. Restrictions may also be in effect on Saturdays and Sundays, each night between 6 p.m. and 10 a.m. Operations will move to I-275 following pavement repairs and bridge work on I-74, and paving work on either route will likely begin in early June. The John R. Jurgensen Company was awarded a contract for approximately $7.99 million to complete the project, and all work is scheduled to be completed in October of 2023. (#22-517)
Near Ross until Oct 1. As the first phase of a resurfacing project gets under way on state Route 126, pavement repairs and a culvert replacement will require lane restrictions and a closure of the route beginning today, May 1. Throughout the week, contractors working for the Ohio Department of Transportation will impart single-lane closures on S.R. 126 between S.R. 748 and S.R. 128 to conduct pavement repairs in advance of resurfacing. Daily lane restrictions will be in place from 7 a.m. to 7 p.m., and traffic will be maintained by flaggers when crews are at work. In addition, a 30-day closure of S.R. 126 will go into effect starting today for a culvert replacement at the 7.66-mile marker, just east of Morgan Ross Road. The closure will be in effect through Friday, June 2, and traffic will be detoured via S.R. 748, S.R. 129, U.S. 27 and S.R. 128. The John R. Jurgensen Company was awarded a contract in the amount of $2.49 million to complete the work, and all work is scheduled to be completed in the fall of 2023. (#220597)
Near Mack until Oct 31. A resurfacing project on S.R. 264 (Bridgetown Road) through Miami and Green townships, from near Indian Brave Trail and the Cleves corporation limit to Parkcrest Drive at Cincinnati. Traffic will be maintained by flaggers daily during hours of operation, from approximately 7 a.m. to 7 p.m. (#22-518)
Near Cleves until Friday. June 5-9: Crews will be replacing a culvert at the 0.15-mile marker on S.R. 128, immediately north of the route's junction with U.S. 50 and south of the community of Hooven. The closure will be in effect Monday, June 5, through Friday, June 9.


From:
     

To:
     


Get the driving conditions around Dent (Ohio) and check the weather in nearby destinations that are easily drivable. You can also check the local altitude and get the Dent (Ohio) elevation in the area. If you're looking for all the possible destinations, try searching for a radius of 1 hour from Dent (Ohio) up to 6 hours from Dent (Ohio) or anything in between. Plan for the weather and check the road conditions from Dent (Ohio) to North Carolina.