Possible roads closed in Ohio: (more info from
ODOT)
Near
Hamilton until Friday. Culvert replacement on S.R. 128 requires closing the route for five days beginning next week.
Beginning Monday, June 5, crews from the Ohio Department of Transportation's Butler County maintenance facility will close S.R. 128, south of Smith Road and Red Bud Lane in the city of Hamilton, to replace the culvert at the 7.05-mile marker.
The closure will be in effect until Friday, June 9, and during closure traffic will be detoured via U.S. 27 and New London Road.
For ongoing traffic, construction and weather-related information throughout the state, please visit www.OHGO.com.
Near
Newport until Oct 31. Bridge rehabilitation project on E. McMillan Street over U.S. Route 42 (Reading Road).
On Monday, June 12, the right two lanes on McMillan Street, between Symmes Street and the on-ramp to I-71 North, will be closed from 7 a.m. to 6 p.m. Lane restrictions may also be in effect on Burnet Avenue at the overpass.
Contractors working for the Ohio Department of Transportation will close a lane on southbound Burnet Avenue under E. McMillan Street daily from 9 a.m. to 4 p.m. while crews continue work on the bridge. Also, one lane remains closed on E. McMillan Street.
The entire project calls for replacing pier pylons and lighting, repairing the substructure, replacing abutment bearings, painting structural steel, resurfacing the bridge deck and other preservation items of the McMillan Street bridge.
Prus Construction Company was awarded a contract for approximately $1.63 million to complete the project, and all work is scheduled to be completed in the summer of 2024.
(22-485)
Near
Ludlow until Sep 30. I-75 Resurfacing - Following a winter hiatus, operations will resume this week for a resurfacing project on Interstate 75 between the Brent Spence Bridge approach and the Western Hills Viaduct.
Sunday-Friday, June 4-9: Lane closures will be in effect on I-75 South between the bridge and Harrison Avenue from 7 p.m. each night to 6 a.m. the following day. Various ramp closures may also be in effect during the overnight hours.
Barrett Paving Materials, Inc., was awarded the $8.6 million project, and all work is scheduled to be completed by late summer.
Near
Sharonville until Jul 31. Safety and interchange improvement project on U.S. Route 42 (Lebanon Road) at Interstate 275 in Sharonville.
Hauck Road is now one-way eastbound from Reading Road to U.S. 42; westbound remains closed.
The project, which began last year, has been rolled out in two parts, with Part 1 calling for he addition of a dedicated right thru-lane on southbound U.S. 42 at Hauck Road and ramp improvements at the I-275 interchange.
Part 2 includes widening Hauck Road to three lanes to add a center, two-way, left-turn lane, as well as curb and gutter installation; culvert replacement; railroad crossing improvements; storm sewer system replacement; and sidewalk construction on the north side of Hauck Road.
Complete General Construction Co. was awarded a contract for approximately $8.9 million to complete the project, and all work is scheduled to be completed in the summer of 2023.
341(21)
Near
Springdale until Jun 30. Pavement repair and paving project on Interstate 275 between east of Winton Road and just west of the I-75 interchange.
The John R. Jurgensen Company was awarded a contract for $2.9 million to complete the project, and all work is scheduled to be completed in the summer of 2023.
(#21-128)
Near
Glendale until May 30, 2025. Interstate 75/Thru the Valley mega project.
Wednesday, June 7: Close the right lane on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 8 p.m. and 6 a.m. Thursday, June 8.
Close the ramp from Sharon Road to I-75 North between 10 p.m. and 5 a.m.
Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 10 p.m. and 5 a.m. Traffic will be maintained with law enforcement officers.
Thursday, June 8: Close the ramp from I-75 North to the I-275 East and West ramp between 10 p.m. and 5 a.m. Friday, June 9. During closure, traffic will be detoured via the Union Centre Road ramp back to I-75 South to I-275.
Close the right lane on I-75 North from Sharon Road to the I-275 ramp between 8 p.m. and 6 a.m.
Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, between 10 p.m. and 5 a.m. Traffic will be maintained with law enforcement officers.
Thursday and Friday, June 7 & 8: Close the ramp from Sharon Road to I-75 North, and the ramp from I-75 North to Sharon Road, each night between 10 p.m. and 5 a.m. the following day. The ramps will not be closed at the same time.
Short-term full closures on I-75 North, from Glendale-Milford Road to the I-275 ramp/Kemper Road bridge, each night between 10 p.m. and 5 a.m. the following day. Traffic will be maintained with law enforcement officers.
(#21--43)
Near
Fairfax until Sep 4. Bridge rehabilitation project along U.S. Route 50 (Columbia Parkway).
The entire project calls for rehabilitating two bridges located on Columbia Parkway, one over Heekin Avenue and one over the westbound ramp to Eastern Avenue, with full deck replacements, substructure repairs, structural steel painting, lighting, approach work, guardrail and railing.
Triton Construction, Inc. was awarded a contract for approximately $6.7 million to complete the project, and all work is scheduled to be completed in fall of 2023.
(#22-143)
Near
Hamilton until Sep 1, 2025. Phase 5B of the I-75/I-74 Mill Creek Expressway.
Wednesday, June 7: Single-lane closures on I-75 North and South, between Mitchell Avenue and Hopple Street, from 8 p.m. to 6 a.m. Thursday, June 8.
Thursday, June 8: Single-lane closure on I-75 North, from Hopple Street to Mitchell Avenue, between 8 p.m. and 6 a.m. Friday, June 9.
Single-lane closure on I-74 East, from Montana Avenue to I-75 South, between 8 p.m. and 6 a.m.
Friday and Saturday, June 9 & 10: Single-lane closure on I-74 East, from Montana Avenue to I-75 South, each night between 8 p.m. and 6 a.m. the following day.
The total project will reconfigure the I-75 South connection to I-74 East and perform additional improvements to the eastbound I-74 connections to I-75. During the initial phase of construction roadway, drainage and lighting improvements will be made on Borden Place, Powers Street, King Place, Elmore Street and Prang Street adjacent to I-74.
As part of this phase of construction, the following changes will be implemented:
Borden Pl. will be converted to a cul-de-sac.
Powers St. will be eliminated between Borden Pl. and King Pl.
The intersection of Powers St. and King Pl. will be reconfigured.
Powers St. will be extended to tie into Colerain Ave.
Prang St. will be relocated to the east.
The Great Lakes Construction Company was awarded the $85 million contract, and all work is scheduled to be complete by late summer 2025.
(203000)
Near
Lockland until Aug 1. SRTS - repair sidewalks and ADA ramps, pedestrian upgrades, etc., Wyoming Avenue in the village of Lockland.
(22-547)
Near
Beckett Ridge until Aug 11. The Butler County Engineer's Office reports that Tylersville Road and Beckett Road will close at the intersection for roundabout construction beginning Tuesday, May 30. The roads will be closed to all through traffic; however, local traffic will still have access up to the construction zone.
In addition, at the start of construction, a temporary road will be installed east of the Lakota West Freshman Campus as an entrance for staff and summer activities.
With the lowest bid of $1.87 million, W.G. Stang, LLC was awarded the ten-week project, including sidewalk reconstruction, lighting, a rapid flashing beacon installation, and storm sewer improvements. Motorists may experience delays before the road closure as the contractor will begin water main work under traffic. Funded by West Chester Township TIF and Butler County Water & Sewer, the roundabout project is tentatively scheduled for completion on August 11, before students return to school.
Beckett Road Detour: Southbound Beckett Road traffic will detour south on S.R. 747 and east on Smith Road.
Tylersville Road Detour: Eastbound Tylersville Road traffic will detour north on S.R. 747, east on Hamilton Mason Road, and south on Lesourdsville West Chester Road. Westbound traffic will reverse this route.