Lockland (Ohio) Road Conditions

White Oak
clear sky    67°F
Clear Sky
Feels like 66.25
Wind speed 10.4 mph
Pressure 1014 hPa
Hamilton
clear sky    67°F
Clear Sky
Feels like 65.84
Wind speed 6.9 mph
Pressure 1016 hPa
Cincinnati
clear sky    68°F
Clear Sky
Feels like 67.53
Wind speed 10.4 mph
Pressure 1015 hPa
Fairfield
clear sky    67°F
Clear Sky
Feels like 66.25
Wind speed 6.9 mph
Pressure 1016 hPa
Forest Park
clear sky    67°F
Clear Sky
Feels like 65.89
Wind speed 6.9 mph
Pressure 1015 hPa
Mason
scattered clouds    66°F
Scattered Clouds
Feels like 65.07
Wind speed 8.1 mph
Pressure 1032 hPa
Newport
clear sky    69°F
Clear Sky
Feels like 68.41
Wind speed 10.4 mph
Pressure 1015 hPa
Fort Thomas
clear sky    69°F
Clear Sky
Feels like 67.68
Wind speed 10.4 mph
Pressure 1015 hPa
Covington
clear sky    69°F
Clear Sky
Feels like 68.58
Wind speed 10.4 mph
Pressure 1015 hPa
Summerside
haze    71°F
Haze
Feels like 71.01
Wind speed 1 mph
Pressure 1013 hPa
Sherwood
haze    72°F
Haze
Feels like 71.62
Wind speed 1 mph
Pressure 1013 hPa
Mount Carmel
haze    71°F
Haze
Feels like 70.95
Wind speed 1 mph
Pressure 1013 hPa
Withamsville
haze    71°F
Haze
Feels like 70.99
Wind speed 1 mph
Pressure 1013 hPa
Salem Heights
haze    72°F
Haze
Feels like 71.2
Wind speed 1 mph
Pressure 1013 hPa
Forestville
haze    72°F
Haze
Feels like 71.29
Wind speed 1 mph
Pressure 1013 hPa
Fruit Hill
haze    72°F
Haze
Feels like 71.37
Wind speed 1 mph
Pressure 1013 hPa
Dry Run
haze    72°F
Haze
Feels like 71.19
Wind speed 1 mph
Pressure 1013 hPa
Cherry Grove
haze    71°F
Haze
Feels like 71.02
Wind speed 1 mph
Pressure 1013 hPa
Highland Heights
haze    71°F
Haze
Feels like 71.19
Wind speed 3.4 mph
Pressure 1013 hPa
Silver Grove
haze    73°F
Haze
Feels like 72.36
Wind speed 1 mph
Pressure 1013 hPa
Norwood
haze    75°F
Haze
Feels like 75.54
Wind speed 0 mph
Pressure 1013 hPa
Elmwood Place
haze    76°F
Haze
Feels like 76.06
Wind speed 0 mph
Pressure 1012 hPa
Fairfax
haze    76°F
Haze
Feels like 75.51
Wind speed 0 mph
Pressure 1012 hPa
Hamilton
haze    76°F
Haze
Feels like 75.87
Wind speed 6.9 mph
Pressure 1012 hPa
Cheviot
haze    75°F
Haze
Feels like 74.77
Wind speed 6.9 mph
Pressure 1012 hPa
Covedale
haze    75°F
Haze
Feels like 74.86
Wind speed 6.9 mph
Pressure 1013 hPa
Newtown
haze    76°F
Haze
Feels like 75.63
Wind speed 0 mph
Pressure 1012 hPa
Golf Manor
haze    75°F
Haze
Feels like 75.2
Wind speed 0 mph
Pressure 1012 hPa
Finneytown
haze    75°F
Haze
Feels like 74.88
Wind speed 0 mph
Pressure 1012 hPa
Saint Bernard
haze    76°F
Haze
Feels like 75.99
Wind speed 6.9 mph
Pressure 1011 hPa
Bridgetown
haze    75°F
Haze
Feels like 74.97
Wind speed 6.9 mph
Pressure 1012 hPa
Monfort Heights
haze    75°F
Haze
Feels like 74.98
Wind speed 6.9 mph
Pressure 1012 hPa
Mack
scattered clouds    75°F
Scattered Clouds
Feels like 74.82
Wind speed 6.9 mph
Pressure 1012 hPa
Ludlow
haze    76°F
Haze
Feels like 75.81
Wind speed 6.9 mph
Pressure 1012 hPa
Villa Hills
haze    75°F
Haze
Feels like 75.06
Wind speed 6.9 mph
Pressure 1012 hPa
Lakeside Park
haze    75°F
Haze
Feels like 74.91
Wind speed 6.9 mph
Pressure 1012 hPa
Wilder
haze    75°F
Haze
Feels like 75.6
Wind speed 6.9 mph
Pressure 1012 hPa
Southgate
haze    75°F
Haze
Feels like 75.09
Wind speed 6.9 mph
Pressure 1012 hPa
Park Hills
haze    75°F
Haze
Feels like 75.36
Wind speed 6.9 mph
Pressure 1012 hPa
Crescent Springs
haze    75°F
Haze
Feels like 75.15
Wind speed 6.9 mph
Pressure 1012 hPa
Dayton
haze    76°F
Haze
Feels like 75.85
Wind speed 6.9 mph
Pressure 1012 hPa
Bellevue
haze    76°F
Haze
Feels like 75.96
Wind speed 6.9 mph
Pressure 1012 hPa
Fort Mitchell
haze    75°F
Haze
Feels like 74.98
Wind speed 6.9 mph
Pressure 1012 hPa
Fort Wright
haze    75°F
Haze
Feels like 75.11
Wind speed 6.9 mph
Pressure 1012 hPa
Delhi Hills
haze    75°F
Haze
Feels like 74.93
Wind speed 6.9 mph
Pressure 1012 hPa
Turpin Hills
haze    75°F
Haze
Feels like 75.18
Wind speed 0 mph
Pressure 1013 hPa
Rossmoyne
clear sky    84°F
Clear Sky
Feels like 84.13
Wind speed 3 mph
Pressure 1008 hPa
Sixteen Mile Stand
clear sky    84°F
Clear Sky
Feels like 84.45
Wind speed 2 mph
Pressure 1011 hPa
Wetherington
clear sky    84°F
Clear Sky
Feels like 84.04
Wind speed 13.8 mph
Pressure 1012 hPa
Terrace Park
clear sky    85°F
Clear Sky
Feels like 85.19
Wind speed 1 mph
Pressure 1011 hPa


Traffic conditions around Lockland (Ohio)





Possible roads closed in Kentucky: (more info from KYTC)
Near Fort Thomas. Work Zone Construction Activities. I-275. Eastbound reduced to two lanes on the Comb-Hehl Bridge. Expect delays.
Near Crescent Springs. Work Zone Construction Activities. BROMLEY-CRESCENT SPRINGS RD. Both directions all lanes blocked from 8 AM to 4 PM daily. Seek alternate route.
Near Fort Wright. Work Zone Construction Activities. MADISON PIKE. Both directions left lane blocked from 9 am to 3 pm daily.

Possible roads closed in Ohio: (more info from ODOT)
Near Newport until Oct 31. Bridge rehabilitation project on E. McMillan Street over U.S. Route 42 (Reading Road). Contractors working for the Ohio Department of Transportation will close a lane on southbound Burnet Avenue under E. McMillan Street daily from 9 a.m. to 4 p.m. while crews continue work on the bridge. Also, one lane remains closed on E. McMillan Street. The entire project calls for replacing pier pylons and lighting, repairing the substructure, replacing abutment bearings, painting structural steel, resurfacing the bridge deck and other preservation items of the McMillan Street bridge. Prus Construction Company was awarded a contract for approximately $1.63 million to complete the project, and all work is scheduled to be completed in the summer of 2024. (22-485)
Near Summerside until Sep 15, 2024. S.R. 32/Bach Buxton Project. With work progressing at the S.R. 32/Bach Buxton Road interchange project in Clermont County, several traffic changes will go into effect next week along the S.R. 32 corridor, including a permanent closure at the Glen Este-Withamsville Road intersection and a temporary ramp closure at the S.R. 32/I-275 South interchange. Friday, June 2: Single-lane closures on S.R. 32 East and West between Eastgate Boulevard and Olive Branch-Stonelick Road, nightly from 7 p.m. to 6 a.m. the following day through Saturday, June 10. Sunday, June 4: Closure of the south leg of Glen Este-Withamsville Road from S.R. 32. This will be a permanent closure. Eastbound S.R. 32 traffic may use the new Clepper Lane off-ramp; westbound S.R. 32 motorists may continue traveling west to the Eastgate Boulevard interchange and follow this to either Eastgate South Drive or Aicholtz Road to Glen Este-Withamsville Road. Southbound Glen Este-Withamsville Road motorists may follow either S.R. 32 East to the Clepper Lane off-ramp or S.R. 32 West to Eastgate Boulevard. Closure of the flyover ramp from southbound I-275 to eastbound S.R. 32 (Exit 63B) beginning at 8 p.m. Sunday and continuing through Friday, June 9. Motorists will use Exit 63A to access S.R. 32 East or West. Wednesday, June 7: Closure of the intersection of Bach Buxton Road and Clepper lane, from 7 p.m. to 6 a.m. Thursday, June 8, for water main work. Southbound Bach Buxton motorists will be detoured by way of S.R. 32, Olive Branch-Stonelick Road, Old S.R. 74, and Shayler Road. Clepper Lane traffic will be detoured via Glen Este-Withamsville Road, Clough Pike, and Shayler Road to Bach Buxton. As part of the Eastern Corridor program, the S.R. 32/Bach Buxton interchange project will create a new, full-service diamond interchange along S.R. 32 immediately east of the existing Elick Lane intersection by realigning and extending Bach Buxton Road over S.R. 32 and connecting with Old S.R. 74 on the north side. The John R. Jurgensen Company was awarded a contract for approximately $42.5 million to undertake the project, and all work is scheduled to be complete in late fall 2024. For ongoing traffic, construction and weather-related information throughout the state, please visit www.OHGO.com. (#21-591)
Near Mount Carmel until Jul 31, 2024. State Route 32 Green-T intersection project. As construction continues on the state Route 32 Green-T intersection project, the following lane closures will be in place next week to switch traffic for the next phase of construction. TBD - On Tuesday, Wednesday and Thursday, June 13-15, single-lane closures will be in effect on S.R. 32 between Beechwood and Winridge roads while contractors for the Ohio Department of Transportation place barrier wall to establish the maintenance of traffic plan, re-routing eastbound S.R. 32 traffic to the westbound side of the route for crews to repair a slide along the eastbound (south) hillside. The lane restrictions will be in effect from 9 a.m. to 3 p.m. each day, and traffic will be maintained by flaggers. Following this, westbound S.R. 32 traffic will continue to use the right lane of S.R. 32 West, and eastbound traffic will be diverted to the left lane of westbound S.R. 32. This phase of construction and the traffic switch is anticipated to be in effect through late August. In addition, Eight Mile Road will remain closed at its junction with S.R. 32 through mid to late fall, and traffic will continue to be detoured via Clough Pike, Mt. Carmel Tobasco Road and S.R. 32. As part of the Green-T project, construction includes widening a portion of S.R. 32; realigning, widening and improving the profile grade on Eight Mile; installing signals; replacing drainage; and repairing a slide repair along eastbound S.R. 32. Once completed, the Green-T intersection will provide for a free-flow of traffic for westbound S.R. 32 motorists with a continuous green light, while turning movements to and from Eight Mile Road and eastbound S.R. 32 traffic will be maintained with a signal. The John R. Jurgensen Company was awarded a contract for approximately $4.57 million to undertake the project, and all work is scheduled to be complete in the summer of 2024. (#220438)
Near Withamsville until Oct 31. Rebuild traffic signal at S.R. 125 and Britton Blvd. (#22-544)
Near Fairfax until Sep 4. Bridge rehabilitation project along U.S. Route 50 (Columbia Parkway). The entire project calls for rehabilitating two bridges located on Columbia Parkway, one over Heekin Avenue and one over the westbound ramp to Eastern Avenue, with full deck replacements, substructure repairs, structural steel painting, lighting, approach work, guardrail and railing. Triton Construction, Inc. was awarded a contract for approximately $6.7 million to complete the project, and all work is scheduled to be completed in fall of 2023. (#22-143)
Near Hamilton until Sep 1, 2025. Phase 5B of the I-75/I-74 Mill Creek Expressway. Wednesday, May 31: Single-lane closure on I-74 East, from Montana Avenue to I-75 South, between 8 p.m. and 6 a.m. Thursday, June 1. Closure of the ramp from Hopple Street to I-75 North between 10 p.m. and 5 a.m. Thursday. Wednesday and Thursday, May 31 & June 1: Single-lane closure on the I-75 North ramp to I-74 West, and single-lane closure on I-74 West (center through lane), between the I-75 and Beekman Street overpasses, from 8 p.m. each night to 6 a.m. the following day. Closure of the ramp from I-74 West to Beekman Street (Exit 18) nightly from 10 p.m. to 6 a.m. Traffic will be detoured via the Montana Avenue interchange and I-74 East to Beekman Street. Thursday, June 1: Single-lane closure on I-74 East, from Montana Avenue to I-75 South, between 8 p.m. and 6 a.m. Friday, June 2. Friday, June 2: Single-lane closure on I-74 East and West, between Montana Avenue and I-75 South, from 8 p.m. to 6 a.m. Saturday, June 3. Single-lane closure on I-75 North, from Hopple Street to I-74 West, between 8 p.m. and 6 a.m. Saturday. Closure of the ramp from Hopple Street to I075 North between 10 p.m. and 5 a.m. Saturday. The total project will reconfigure the I-75 South connection to I-74 East and perform additional improvements to the eastbound I-74 connections to I-75. During the initial phase of construction roadway, drainage and lighting improvements will be made on Borden Place, Powers Street, King Place, Elmore Street and Prang Street adjacent to I-74. As part of this phase of construction, the following changes will be implemented: Borden Pl. will be converted to a cul-de-sac. Powers St. will be eliminated between Borden Pl. and King Pl. The intersection of Powers St. and King Pl. will be reconfigured. Powers St. will be extended to tie into Colerain Ave. Prang St. will be relocated to the east. The Great Lakes Construction Company was awarded the $85 million contract, and all work is scheduled to be complete by late summer 2025. (203000)
Near Mack until Oct 31. A resurfacing project on S.R. 264 (Bridgetown Road) through Miami and Green townships, from near Indian Brave Trail and the Cleves corporation limit to Parkcrest Drive at Cincinnati. Traffic will be maintained by flaggers daily during hours of operation, from approximately 7 a.m. to 7 p.m. (#22-518)
Near Ludlow until Sep 30. I-75 Resurfacing - Following a winter hiatus, operations will resume this week for a resurfacing project on Interstate 75 between the Brent Spence Bridge approach and the Western Hills Viaduct. On Wednesday and Thursday, May 24 and 25, contractors for the Ohio Department of Transportation will be paving I-75 South between the viaduct and the bridge during the late evening and overnight hours. Single-lane closures will be in effect beginning at 8 p.m. each night, followed by a double-lane closure at 9 p.m. and a triple-lane closure at 11 p.m., with all restrictions lifted by 6 a.m. the following day. Then beginning Tuesday, May 30, and continuing through Friday, June 2, crews will be paving the high-speed shoulder and high-speed lane of I-75 North. Single-lane closures will be in effect in the two-lane section between the bridge and Harrison Avenue from 8 p.m. each night to 6 a.m. the following day. Barrett Paving Materials, Inc., was awarded the $8.6 million project, and all work is scheduled to be completed by late summer.
Near Delhi Hills until Oct 31. The Cincinnati Department of Transportation & Engineering (DOTE) has begun a $5 million street rehabilitation project extending nearly four miles along River Road/U.S. 50 between Anderson Ferry Road in Delhi to Dart Street in Sayler Park. Crews this week are on site marking locations that need full-depth base repairs. Excavation is expected to begin next week. Crews will work in the opposite travel lanes as rush hour traffic ¿ heading westbound away from Downtown before 9 a.m. and eastbound after 9 a.m. All work will wrap up by 4 p.m. daily. Through traffic will continue to be allowed during the eight-month project, though motorists should expect intermittent delays, depending on the work being performed. Message boards are posted at both ends of the work zone to alert motorists of upcoming construction activity. Motorists are asked to slow down and pass through the area with caution. The project is scheduled to be completed by Oct. 31. The contractor is Cincinnati-based John R. Jurgensen Co. The $5 million project is funded with a combination of city capital and a Southwest Ohio Regional Transit Authority (SORTA) transportation infrastructure grant.
Near Sixteen Mile Stand until Jun 16. Fields-Ertel Road interchange expansion project at Mason-Montgomery Road and southbound Interstate 71 in Warren County. Lane restrictions will be in place during the evening and overnight hours on Mason-Montgomery Road tonight as part of the interchange project in Warren County. Beginning at approximately 7 p.m. Thursday, June 1, lane closures will be in place on eastbound Mason-Montgomery Road, from Escort Drive to the Interstate 71 underpass, for crews to pave the road. The lane closures will be in effect until 6 a.m. Friday, June 2, and traffic will be maintained with flagging operations. Along with a new bridge over Fields-Ertel, the total project includes construction of an entrance ramp from Mason-Montgomery Road to I-71 South; a new southbound turn lane on Mason-Montgomery from Escort Drive to the ramp; and an entrance taper on I-71 South, between the Fields-Ertel Road bridge and the existing ramp from Fields-Ertel. The Eagle Bridge Company was awarded a contract for approximately $4.7 million to undertake the project, and all work is scheduled to be completed by early summer of 2023. (#21-301)
Near Wetherington until Jun 30. Butler County Engineers Office - reconfigure the interchange of S.R. 129 at Liberty Way and I-75. Crews will be milling asphalt and paving in a moving operation on the ramps, requiring temporary ramp closures. All lane closures will begin at 8:00 p.m., and ramp closures will begin at 10:00 p.m. Restrictions will be lifted by 6:00 a.m. each morning. While construction continues into 2023, the interchange modification is fully operational. Eastbound S.R. 129 traffic will use the Cincinnati-Dayton Road exit or the Cox Road roundabout to access Liberty Way, and the S.R. 129 exit to Liberty Way is permanently closed. Existing ramp connections will also be reconfigured along with the construction of a new bridge. Additional ramp paving has been included in this project. Sunesis Construction was awarded the contract for $24,516,510 to perform the S.R. 129/Liberty Way/I-75 Interchange Modification project. The project is tentatively scheduled to be completed in summer of 2023.


From:
     

To:
     


Get the driving conditions around Lockland (Ohio) and check the weather in nearby destinations that are easily drivable. You can also check the local altitude and get the Lockland (Ohio) elevation in the area. If you're looking for all the possible destinations, try searching for a radius of 1 hour from Lockland (Ohio) up to 6 hours from Lockland (Ohio) or anything in between. Plan for the weather and check the road conditions from Lockland (Ohio) to Wisconsin.