Monfort Heights (Ohio) Road Conditions

White Oak
scattered clouds    63°F
Scattered Clouds
Feels like 62.65
Wind speed 8.1 mph
Pressure 1016 hPa
Cincinnati
clear sky    64°F
Clear Sky
Feels like 63.37
Wind speed 5.7 mph
Pressure 1009 hPa
Fairfield
few clouds    64°F
Few Clouds
Feels like 63.99
Wind speed 3.4 mph
Pressure 1018 hPa
Forest Park
overcast clouds    63°F
Overcast Clouds
Feels like 63.09
Wind speed 1 mph
Pressure 1016 hPa
Covington
clear sky    64°F
Clear Sky
Feels like 63.57
Wind speed 5.7 mph
Pressure 1006 hPa
Florence
broken clouds    62°F
Broken Clouds
Feels like 61.61
Wind speed 5.7 mph
Pressure 1017 hPa
Erlanger
broken clouds    62°F
Broken Clouds
Feels like 61.72
Wind speed 5.7 mph
Pressure 1017 hPa
Newport
clear sky    64°F
Clear Sky
Feels like 63.52
Wind speed 5.7 mph
Pressure 1008 hPa
Fort Thomas
clear sky    63°F
Clear Sky
Feels like 62.67
Wind speed 5.7 mph
Pressure 1008 hPa
Burlington
broken clouds    62°F
Broken Clouds
Feels like 62.06
Wind speed 5.7 mph
Pressure 1017 hPa
Miami Heights
overcast clouds    72°F
Overcast Clouds
Feels like 70.92
Wind speed 4.6 mph
Pressure 1017 hPa
Cleves
overcast clouds    72°F
Overcast Clouds
Feels like 71.56
Wind speed 4.6 mph
Pressure 1017 hPa
Villa Hills
overcast clouds    71°F
Overcast Clouds
Feels like 70.57
Wind speed 8.1 mph
Pressure 1017 hPa
Hebron
overcast clouds    71°F
Overcast Clouds
Feels like 70.45
Wind speed 3.4 mph
Pressure 1017 hPa
Edgewood
overcast clouds    71°F
Overcast Clouds
Feels like 70.34
Wind speed 8.1 mph
Pressure 1017 hPa
Oakbrook
overcast clouds    71°F
Overcast Clouds
Feels like 70.54
Wind speed 3.4 mph
Pressure 1017 hPa
Francisville
overcast clouds    72°F
Overcast Clouds
Feels like 70.74
Wind speed 4.6 mph
Pressure 1017 hPa
Lakeside Park
overcast clouds    71°F
Overcast Clouds
Feels like 70.34
Wind speed 8.1 mph
Pressure 1017 hPa
Crescent Springs
overcast clouds    71°F
Overcast Clouds
Feels like 70.65
Wind speed 8.1 mph
Pressure 1017 hPa
Crestview Hills
overcast clouds    71°F
Overcast Clouds
Feels like 70.56
Wind speed 8.1 mph
Pressure 1017 hPa
Elsmere
overcast clouds    71°F
Overcast Clouds
Feels like 70.39
Wind speed 8.1 mph
Pressure 1017 hPa
Delhi Hills
overcast clouds    71°F
Overcast Clouds
Feels like 70.57
Wind speed 8.1 mph
Pressure 1017 hPa
Northgate
broken clouds    68°F
Broken Clouds
Feels like 66.83
Wind speed 5.8 mph
Pressure 1020 hPa
Grandview
scattered clouds    68°F
Scattered Clouds
Feels like 67.28
Wind speed 5.8 mph
Pressure 1019 hPa
Cheviot
broken clouds    67°F
Broken Clouds
Feels like 66.09
Wind speed 5.8 mph
Pressure 1019 hPa
Miamitown
scattered clouds    69°F
Scattered Clouds
Feels like 67.82
Wind speed 5.8 mph
Pressure 1019 hPa
Dent
scattered clouds    68°F
Scattered Clouds
Feels like 66.83
Wind speed 5.8 mph
Pressure 1019 hPa
Groesbeck
broken clouds    68°F
Broken Clouds
Feels like 66.58
Wind speed 5.8 mph
Pressure 1020 hPa
Dry Ridge
scattered clouds    68°F
Scattered Clouds
Feels like 66.69
Wind speed 5.8 mph
Pressure 1019 hPa
Ross
scattered clouds    69°F
Scattered Clouds
Feels like 68.04
Wind speed 5.8 mph
Pressure 1019 hPa
Bridgetown
broken clouds    67°F
Broken Clouds
Feels like 66.25
Wind speed 5.8 mph
Pressure 1019 hPa
Mack
broken clouds    67°F
Broken Clouds
Feels like 66.27
Wind speed 5.8 mph
Pressure 1019 hPa
Northbrook
broken clouds    68°F
Broken Clouds
Feels like 67.01
Wind speed 5.8 mph
Pressure 1020 hPa
Dunlap
broken clouds    68°F
Broken Clouds
Feels like 67.19
Wind speed 5.8 mph
Pressure 1019 hPa
Cold Spring
clear sky    59°F
Clear Sky
Feels like 57.54
Wind speed 0 mph
Pressure 1020 hPa
Taylor Mill
clear sky    59°F
Clear Sky
Feels like 57.67
Wind speed 0 mph
Pressure 1020 hPa
Wilder
clear sky    59°F
Clear Sky
Feels like 58.23
Wind speed 0 mph
Pressure 1020 hPa
Southgate
clear sky    59°F
Clear Sky
Feels like 57.9
Wind speed 0 mph
Pressure 1012 hPa
Ludlow
clear sky    59°F
Clear Sky
Feels like 58.24
Wind speed 0 mph
Pressure 1020 hPa
Highland Heights
clear sky    59°F
Clear Sky
Feels like 57.67
Wind speed 0 mph
Pressure 1020 hPa
Fort Mitchell
broken clouds    58°F
Broken Clouds
Feels like 57.31
Wind speed 0 mph
Pressure 1020 hPa
Fort Wright
clear sky    59°F
Clear Sky
Feels like 57.56
Wind speed 0 mph
Pressure 1020 hPa
Park Hills
clear sky    59°F
Clear Sky
Feels like 57.88
Wind speed 0 mph
Pressure 1020 hPa


Traffic conditions around Monfort Heights (Ohio)





Possible roads closed in Kentucky: (more info from KYTC)
Near Florence. Work Zone Construction Activities. US-42. Lane blocked over I-75.
Near Erlanger. Work Zone Construction Activities. DONALDSON HWY. In both directions of Donaldson Pike (KY 236) between KY 842 (Houston Rd) and KY 3076 (Mineonla Pike) expect blocked lanes and delays. Watch for flaggers.
Near Fort Thomas. Work Zone Construction Activities. I-275. Eastbound reduced to two lanes on the Comb-Hehl Bridge. Expect delays.
Near Edgewood. Work Zone Construction Activities. STEVENSON RD. Both directions expect blocked lanes and delays.
Near Oakbrook. Work Zone Construction Activities. BURLINGTON PIKE. Both directions reduced to one lane between Ridge Rd. and KY 842 (Houston Rd) from 6 pm to 6 am nightly. Expect delays.
Near Crescent Springs. Work Zone Construction Activities. BROMLEY-CRESCENT SPRINGS RD. Both directions all lanes blocked from 8 AM to 4 PM daily. Seek alternate route.
Near Crestview Hills. Work Zone Construction Activities. I-275 NC. A bridge deck overlay project will take place beginning Sunday, May 14 at 9 p.m. Crews will begin work on the left two lanes of I-275 eastbound, allowing traffic to flow on the right two lanes. All lanes from the I-71/75 northbound ramp to I-275 eastbound will remain open. The left two lanes of I-275 eastbound following the I-71/75 northbound ramp will be closed. This traffic pattern will be in place from Sunday, May 14 to Saturday, May 20. On Saturday, May 20, crews will perform a traffic switch, allowing traffic on the left two lanes from Saturday, May 20 through Thursday, May 25. Crews will be closing the I-275 eastbound exit to Turkeyfoot Road for the entirety of the project. The project is expected to be completed by Thursday, May 25 at midnight. No lane/ramp closures will take place during Memorial Day weekend.
Near Elsmere. Work Zone Construction Activities. MOUNT ZION RD. Lane blocked for roundabout construction at the intersection of Mt. Zion Rd. and Sigmon Lane.
Near Fort Mitchell. Hazard Roadway or Lane Blocking Incident. I-75 NC. May be viewed on CCTV_06_75_1877.
Near Fort Wright. Work Zone Construction Activities. MADISON PIKE. Both directions left lane blocked from 9 am to 3 pm daily.
Near Park Hills. Work Zone Construction Activities. I-75. Northbound left two lanes blocked near the Fifth Street and 12th Street exits in Covington.

Possible roads closed in Ohio: (more info from ODOT)
Near White Oak until Jun 1. Install micro-conduit on S.R. 126 between I-275 and U.S. 27. Also install on I-275 between S.R. 28 and S.R. 32. (#223004)
Near Newport until Oct 31. Bridge rehabilitation project on E. McMillan Street over U.S. Route 42 (Reading Road). Contractors working for the Ohio Department of Transportation will close a lane on southbound Burnet Avenue under E. McMillan Street daily from 9 a.m. to 4 p.m. while crews continue work on the bridge. Also, one lane remains closed on E. McMillan Street. The entire project calls for replacing pier pylons and lighting, repairing the substructure, replacing abutment bearings, painting structural steel, resurfacing the bridge deck and other preservation items of the McMillan Street bridge. Prus Construction Company was awarded a contract for approximately $1.63 million to complete the project, and all work is scheduled to be completed in the summer of 2024. (22-485)
Near Delhi Hills until Oct 31. The Cincinnati Department of Transportation & Engineering (DOTE) has begun a $5 million street rehabilitation project extending nearly four miles along River Road/U.S. 50 between Anderson Ferry Road in Delhi to Dart Street in Sayler Park. Crews this week are on site marking locations that need full-depth base repairs. Excavation is expected to begin next week. Crews will work in the opposite travel lanes as rush hour traffic ¿ heading westbound away from Downtown before 9 a.m. and eastbound after 9 a.m. All work will wrap up by 4 p.m. daily. Through traffic will continue to be allowed during the eight-month project, though motorists should expect intermittent delays, depending on the work being performed. Message boards are posted at both ends of the work zone to alert motorists of upcoming construction activity. Motorists are asked to slow down and pass through the area with caution. The project is scheduled to be completed by Oct. 31. The contractor is Cincinnati-based John R. Jurgensen Co. The $5 million project is funded with a combination of city capital and a Southwest Ohio Regional Transit Authority (SORTA) transportation infrastructure grant.
Near Miamitown until Oct 15. Resurface portions of I-74 and I-275. The project includes pavement repairs and resurfacing I-74 from the Dry Fork Road interchange to just west of the Hamilton/Cleves Road interchange, as well as I-275, between its junction with I-74 and the Kilby Road interchange. The project also includes minor bridge work at structures on I-74. Contractors for the Ohio Department of Transportation will impart single-lane closures on I-74, and traffic will be maintained in one lane on weekdays, Monday through Friday, from 8 p.m. each night to 6 a.m. the following day. Restrictions may also be in effect on Saturdays and Sundays, each night between 6 p.m. and 10 a.m. Operations will move to I-275 following pavement repairs and bridge work on I-74, and paving work on either route will likely begin in early June. The John R. Jurgensen Company was awarded a contract for approximately $7.99 million to complete the project, and all work is scheduled to be completed in October of 2023. (#22-517)
Near Ross until Jun 1. Installation of left-turn lanes in both directions on U.S. 27 at New London Road and Herman Road, and on U.S. 27 South at Ross-Millville Road. As work continues on the U.S. 27 intersection improvement project at New London and Herman roads, lane closures will be in place next week. On Monday, May 22, a single-lane closure will be in place on U.S. 27 between Herman and Ross Millville roads from 9 a.m. to 2 p.m. for pavement work. Traffic will be maintained with flaggers. Then, on Tuesday and Wednesday, May 23 & 24, contractors working for the Ohio Department of Transportation will be working in the center turn lanes and shoulders on U.S. 27 installing pavement markings between 7 p.m. and 6 a.m. the following day. Traffic will be maintained with flaggers as needed. The entire project is scheduled to be completed in the summer of 2023. (#220082)
Near Mack until Oct 31. A resurfacing project on S.R. 264 (Bridgetown Road) through Miami and Green townships, from near Indian Brave Trail and the Cleves corporation limit to Parkcrest Drive at Cincinnati. Traffic will be maintained by flaggers daily during hours of operation, from approximately 7 a.m. to 7 p.m. (#22-518)
Near Ludlow until Sep 30. I-75 Resurfacing - On I-75 North and South, between the Brent Spence Bridge and Harrison Avenue. Operations are scheduled to resume Sunday, May 21, following a winter hiatus, and crews will be paving the final surface course and applying permanent pavement markings on the mainline, as well as the various ramps within the project limits. A schedule for restrictions has yet to be determined; however, all work is anticipated to be completed by late summer.


From:
     

To:
     


Get the driving conditions around Monfort Heights (Ohio) and check the weather in nearby destinations that are easily drivable. You can also check the local altitude and get the Monfort Heights (Ohio) elevation in the area. If you're looking for all the possible destinations, try searching for a radius of 1 hour from Monfort Heights (Ohio) up to 6 hours from Monfort Heights (Ohio) or anything in between. Plan for the weather and check the road conditions from Monfort Heights (Ohio) to Missouri.