Weather around Highland Heights (Kentucky)

Fairfax
clear sky    68°F
Clear Sky
Feels like 67.57
Wind speed 8.1 mph
Pressure 1021 hPa
Hamilton
clear sky    68°F
Clear Sky
Feels like 67.57
Wind speed 8.1 mph
Pressure 1022 hPa
Lockland
clear sky    68°F
Clear Sky
Feels like 67.64
Wind speed 8.1 mph
Pressure 1022 hPa
Amberley
clear sky    67°F
Clear Sky
Feels like 66.6
Wind speed 8.1 mph
Pressure 1022 hPa
Dry Run
clear sky    67°F
Clear Sky
Feels like 66.51
Wind speed 8.1 mph
Pressure 1022 hPa
Wyoming
clear sky    68°F
Clear Sky
Feels like 67.6
Wind speed 8.1 mph
Pressure 1023 hPa
Finneytown
clear sky    67°F
Clear Sky
Feels like 66.65
Wind speed 8.1 mph
Pressure 1023 hPa
Rossmoyne
clear sky    67°F
Clear Sky
Feels like 66.49
Wind speed 8.1 mph
Pressure 1022 hPa
Mount Carmel
clear sky    67°F
Clear Sky
Feels like 66.27
Wind speed 8.1 mph
Pressure 1022 hPa
Dillonvale
clear sky    67°F
Clear Sky
Feels like 66.69
Wind speed 8.1 mph
Pressure 1022 hPa
Madeira
clear sky    67°F
Clear Sky
Feels like 66.63
Wind speed 8.1 mph
Pressure 1022 hPa
Reading
clear sky    68°F
Clear Sky
Feels like 67.5
Wind speed 8.1 mph
Pressure 1022 hPa
Turpin Hills
clear sky    68°F
Clear Sky
Feels like 67.19
Wind speed 8.1 mph
Pressure 1022 hPa
Norwood
clear sky    68°F
Clear Sky
Feels like 67.39
Wind speed 8.1 mph
Pressure 1022 hPa
Elmwood Place
clear sky    68°F
Clear Sky
Feels like 67.87
Wind speed 8.1 mph
Pressure 1022 hPa
Deer Park
clear sky    67°F
Clear Sky
Feels like 66.38
Wind speed 8.1 mph
Pressure 1022 hPa
Terrace Park
clear sky    68°F
Clear Sky
Feels like 67.41
Wind speed 8.1 mph
Pressure 1021 hPa
Dayton
clear sky    68°F
Clear Sky
Feels like 67.77
Wind speed 8.1 mph
Pressure 1022 hPa
Golf Manor
clear sky    68°F
Clear Sky
Feels like 67.14
Wind speed 8.1 mph
Pressure 1022 hPa
Blue Ash
clear sky    67°F
Clear Sky
Feels like 66.4
Wind speed 8.1 mph
Pressure 1022 hPa
Milford
clear sky    68°F
Clear Sky
Feels like 67.15
Wind speed 8.1 mph
Pressure 1021 hPa
North College Hill
clear sky    67°F
Clear Sky
Feels like 66.76
Wind speed 11.5 mph
Pressure 1022 hPa
Saint Bernard
clear sky    68°F
Clear Sky
Feels like 67.77
Wind speed 8.1 mph
Pressure 1022 hPa
Montgomery
clear sky    67°F
Clear Sky
Feels like 66.6
Wind speed 8.1 mph
Pressure 1022 hPa
Mariemont
clear sky    68°F
Clear Sky
Feels like 67.46
Wind speed 8.1 mph
Pressure 1021 hPa
Silverton
clear sky    67°F
Clear Sky
Feels like 66.6
Wind speed 8.1 mph
Pressure 1022 hPa
Kenwood
clear sky    67°F
Clear Sky
Feels like 66.79
Wind speed 8.1 mph
Pressure 1022 hPa
Cincinnati
clear sky    68°F
Clear Sky
Feels like 67.53
Wind speed 8.1 mph
Pressure 1022 hPa
White Oak
clear sky    67°F
Clear Sky
Feels like 66.63
Wind speed 11.5 mph
Pressure 1022 hPa
Covington
clear sky    69°F
Clear Sky
Feels like 68.2
Wind speed 8.1 mph
Pressure 1021 hPa
Independence
overcast clouds    68°F
Overcast Clouds
Feels like 66.99
Wind speed 7.7 mph
Pressure 1022 hPa
Florence
overcast clouds    68°F
Overcast Clouds
Feels like 67.08
Wind speed 2 mph
Pressure 1021 hPa
Erlanger
clear sky    67°F
Clear Sky
Feels like 66.92
Wind speed 8.1 mph
Pressure 1021 hPa
Newport
clear sky    69°F
Clear Sky
Feels like 68.09
Wind speed 8.1 mph
Pressure 1021 hPa
Fort Thomas
clear sky    68°F
Clear Sky
Feels like 67.35
Wind speed 8.1 mph
Pressure 1022 hPa
Newtown
clear sky    68°F
Clear Sky
Feels like 67.69
Wind speed 8.1 mph
Pressure 1021 hPa
New Richmond
clear sky    65°F
Clear Sky
Feels like 64.42
Wind speed 5.8 mph
Pressure 1023 hPa
Salem Heights
clear sky    64°F
Clear Sky
Feels like 63.25
Wind speed 5.8 mph
Pressure 1022 hPa
Ludlow
clear sky    65°F
Clear Sky
Feels like 64.31
Wind speed 5.8 mph
Pressure 1023 hPa
Edgewood
scattered clouds    64°F
Scattered Clouds
Feels like 63.66
Wind speed 9.2 mph
Pressure 1022 hPa
Walton
scattered clouds    64°F
Scattered Clouds
Feels like 64.04
Wind speed 9.2 mph
Pressure 1022 hPa
Lakeside Park
scattered clouds    64°F
Scattered Clouds
Feels like 63.55
Wind speed 9.2 mph
Pressure 1022 hPa
Wilder
clear sky    65°F
Clear Sky
Feels like 64.11
Wind speed 9.2 mph
Pressure 1022 hPa
Claryville
overcast clouds    65°F
Overcast Clouds
Feels like 64.47
Wind speed 6.7 mph
Pressure 1022 hPa
Highland Heights
clear sky    64°F
Clear Sky
Feels like 63.55
Wind speed 9.2 mph
Pressure 1022 hPa
Fort Mitchell
scattered clouds    64°F
Scattered Clouds
Feels like 63.61
Wind speed 9.2 mph
Pressure 1022 hPa
Alexandria
clear sky    64°F
Clear Sky
Feels like 63.61
Wind speed 5.8 mph
Pressure 1022 hPa
Cold Spring
clear sky    64°F
Clear Sky
Feels like 63.41
Wind speed 9.2 mph
Pressure 1022 hPa
Fort Wright
clear sky    64°F
Clear Sky
Feels like 63.63
Wind speed 9.2 mph
Pressure 1023 hPa
Delhi Hills
clear sky    64°F
Clear Sky
Feels like 63.45
Wind speed 5.8 mph
Pressure 1023 hPa

Possible roads closed in Kentucky: (more info from KYTC)
Near Covington. Work Zone Construction Activities. I-75 RAMP to KY 8. The Kentucky Transportation Cabinet (KYTC) today announced the updated schedule for several temporary ramp closures that will be put into place for the Texas Turnaround project. On Monday, April 11, at approximately 9 p.m., weather permitting, the entrance ramp to I-71/75 northbound from Pike St. will be closed for 180 days. A detour route will be put into place and marked with signage. Traffic will be directed to follow Bullock St. to I-71/75 southbound to Kyles Ln., and then reenter I-71/75 northbound. Also, on Monday, April 11, at approximately 9 p.m., weather permitting, the exit ramp from I-71/75 northbound to 5th St. will be closed for 180 days. A detour route will be put into place and marked with signage. Traffic will be directed to use the 12th St. exit from I-71/75 northbound to Simon Kenton Way to Pike St. to Main St. to 5th St. KYTC also noted that access to the entrance ramp to I-71/75 northbound from 4th St. will not immediately be impacted, and is not anticipated to close until closer to project completion, which is expected by the end of the year. Texas Turnaround project information and updates can be found at DrivingNKYProgress.org.
Near Florence. Work Zone Work Zone. US-42. Lane blocked over I-75. Expect Delays.
Near New Richmond. Work Zone Construction Activities. AA HWY. Lane blocked, expect delays.
Near Walton. Work Zone Construction Activities. DIXIE HWY. Expect blocked lanes and delays between Logistics Blvd. and Duffel Ln.
Near Claryville. Work Zone Construction Activities. ALEXANDRIA PIKE. Lane blocked at the intersection of Plum Creek Church Rd.
Near Alexandria. Work Zone Construction Activities. AA HWY NC. Both directions reduced to one lane between KY 709 (E. Alexandria Pike) and KY 1997 (Stonehouse Rd). Expect delays.
Near Cold Spring. Work Zone Construction Activities. ALEXANDRIA PIKE. Lane blocked at US 27 and Crossroads Blvd. Expect delays.

Possible roads closed in Ohio: (more info from ODOT)
Near Fairfax until Jun 1, 2023. Bridge rehabilitation project along U.S. Route 50 (Columbia Parkway). In preparation for bridge work, contractors for the Ohio Department of Transportation will be constructing median crossovers, which will require lane and shoulder closures during construction. Beginning Monday, August 8, the right lane and shoulder of eastbound Columbia Parkway will be closed from the Beechmont Avenue to the Red Bank Road interchanges between 6 a.m. and 4 p.m. daily through Monday, August 15. Then, on August 15, the left lane will be closed in each direction from 7 a.m. to 4 p.m. daily through Wednesday, September 7. The entire project calls for rehabilitating two bridges located on Columbia Parkway, one over Heekin Avenue and one over the westbound ramp to Eastern Avenue, with full deck replacements, substructure repairs, structural steel painting, lighting, approach work, guardrail and railing. Triton Construction, Inc. was awarded a contract for approximately $6.7 million to complete the project, and all work is scheduled to be completed in summer of 2023. (#220143)
Near Hamilton until Sep 30. Phase 5A of the Mill Creek Expressway project. Thursday, August 11: Single-lane closure on I-75 North, between Hopple Street and Mitchell Avenue, beginning at 8 p.m., followed by a double-lane closure beginning at 10 p.m. All restrictions will be lifted by 6 a.m. Friday. Single-lane closure on I-75 South, between Mitchell Avenue and the I-75/74 split, from 8 p.m. to 6 a.m. Single-lane closure on I-74 East, between the bridge over Elmore Street and the I-75/74 split, from 8 p.m. to 6 a.m. Closure of the ramp from Beekman Street to I-74 East, from 10 p.m. to 5 a.m. Traffic will be detoured via I-74 West to the Montana Avenue interchange and I-74 East. Closure of the ramp from I-74 East to I-75 North, from 9 p.m. to 5 a.m. Traffic will be detoured via I-75 South and the Hopple Street interchange to I-75 North. Single-lane closure on I-74 West, between Hopple Street and the bridge over Mill Creek, from 8 p.m. to 6 a.m. Friday, August 12: Single-lane closure on I-74 East, between the bridge over Elmore Street and the I-75/74 split, from 8 p.m. to 7 a.m. Saturday. Closure of the ramp from Beekman Street to I-74 East, from 10 p.m. to 5 a.m. Traffic will be detoured via I-74 West to the Montana Avenue interchange and I-74 East. Single-lane closure on I-74 West, between Hopple Street and the bridge over Mill Creek, from two hours after Bengals game ends to 7 a.m. Closure of the ramp from northbound Beekman Street to I-74 West, from 10 p.m. to 5 a.m. Monday. Traffic will be detoured via Colerain Avenue and I-74 West. Single-lane closure on I-75 South, between Mitchell Avenue and the I-75 South/I-74 East split, from 8 p.m. to 7 a.m. Single-lane closure on I-75 North, between Hopple Street and the ramp from I-74 East to I-75 North, from two hours after the Bengals game ends to 7 a.m. Closure of the ramp from Hopple Street to I-75 North, from two hours after the Bengals game ends to 5 a.m. Traffic will be detoured via I-74 West and the Montana Avenue interchange to I-75 North. Saturday, August 13: Single-lane closure on I-74 East, between the bridge over Elmore Street and the I-75/74 split, from 7 p.m. to 7 a.m. Sunday. Closure of the ramp from Beekman Street to I-74 East, from 10 p.m. to 5 a.m. Traffic will be detoured via I-74 West to the Montana Avenue interchange and I-74 East. Single-lane closure on I-74 West between Hopple Street and the bridge over Mill Creek, from one hour after FC Cincy game ends to 7 a.m. Single-lane closure on I-75 North, from Hopple Street to the ramp from I-74 East to I-75 North, from one hour after the FC Cincy game ends to 7 a.m. Closure of the ramp from Hopple Street to I-75 North, from one hour after the FC Cincy game ends to 5 a.m. Traffic will be detoured via I-74 West and the Montana Avenue interchange to I-75 North. All work will be contingent upon the weather, and motorists are reminded of the need for additional caution through the work zone to help ensure the safety of crews, as well as the traveling public. (183000)
Near Turpin Hills until Aug 31. The Little Miami Scenic Trail project. Beginning at 7:30 a.m. Thursday, August 11, the ramp from state Route 32 to eastbound S.R. 125 will be closed until 5 p.m. During closure, traffic will be detoured via the S.R. 125 West ramp, Beechmont Circle and Wilmer Avenue. The Kokosing Construction Company was awarded a contract for approximately $7.9 million to construct a new segment of the Little Miami Scenic Trail under the existing S.R. 32/Beechmont Avenue interchange and across the Little Miami River (LMR), and all work is scheduled to be completed by late summer.
Near Terrace Park until Aug 31. Four lane resurfacing on S.R. 450 adjacent to I-275. The John R. Jurgensen Company was awarded a $1.4 million contract, and work is scheduled to be complete in early fall, 2022. (#210596)
Near Montgomery until Oct 15. A resurfacing project on state Route 126 between the city of Milford and the village of Indian Hill is scheduled to begin, with traffic restrictions starting next week. Beginning Wednesday, July 13, contractors for the Ohio Department of Transportation will impart single-lane closures on S.R. 126 for pavement repairs, and traffic will be maintained by flaggers from 7 a.m. to 8 p.m. daily during the initial phase of construction. The project extends from just west of Loveland Madeira Road near Indian Hill to Shawnee Run Road at Milford, and along with resurfacing, it includes pavement repairs, curb ramp upgrades, and guardrail replacement. Barrett Paving Materials, Inc. was awarded a contract for $1.8 million to complete the project, and throughout construction, traffic will be maintained by flaggers. All work is scheduled to be completed by late fall of 2022. (#21-509)
Near Silverton until Sep 30. Work to repair a culvert located on the Interstate 71 North ramp to Stewart Road. Sunesis Construction Company was awarded a contract for approximately $507,674 to complete the work, and all work is scheduled to be completed by September 2022. (#22-124)
Near Ludlow until Oct 31. Bridge preservation project on U.S. Route 50 (W. Sixth Street). Work also includes bridge deck sealing on state Route 562 and Interstate 75, at dates to be determined. A & A Painting, LLC was awarded a contract for approximately $862,288 to complete the project, and all work is scheduled to be completed by mid-fall 2022. (#21-458)


From:
     

To:
     


Get the driving conditions around Highland Heights (Kentucky) and check the weather in nearby destinations that are easily drivable. If you're looking for all the possible destinations, try searching for a radius of 1 hour from Highland Heights (Kentucky) up to 6 hours from Highland Heights (Kentucky) or anything in between. Plan for the weather and check the road conditions from Highland Heights (Kentucky) to South Carolina.