Possible roads closed in Vermont: (more info from
Vermont AOT)
Near
South Barre until Jun 17. US 302 in Barre Town near McLaughlin Rd, Re-paving of bridge. Temporary traffic signals shall be installed and the roadway will be reduced to one-lane for the duration of the project.
Near
Hardwick until Aug 5. VT 14, 7.6 miles north of junction with US 2 Complete replacement of bridge with single lane closure. This project is phased construction with a temporary traffic signal. 12' lane restriction.
Near
Brownsville until Jun 30. Starting 4/25 in Weathersfield, paving VT 131 from the intersection of VT 106 and east to intersection of I-91. 14' Lane restriction at it's narrowest.
Near
Fairlee until Oct 27. Preventative maintenance repairs to existing bridges. On I-91NB and SB between Fairlee & St. Johnsbury. Lane Closures/ Shifted Traffic Lanes/ Potential On-ramp Closure at Exit 20.
Near
Randolph until Jun 24. On VT 107 Stockbridge -Slope stabilization, drainage improvements, and other highway related items. Lane closure with temp. conc. barrier & signals. Minimum 14-foot paved width.
Near
Washington until Oct 1. Beginning 4/11/22 I-89SB between exits 8 and 4 (Montpelier into Brookfield) Repaving of highway including off and on ramps. Plan on alternating one lane traffic through the work zone.
Near
North Hero until Jul 1. UPDATE: New traffic pattern. Two-way traffic has transitioned to the temporary bridge. Reduced speed limit and tight curves approaching the bridge. Please exercise extreme caution.
Near
Montpelier until Oct 28. Starting March 24th.Deck replacement of bridge on US 2 Just east of Gallison Hill in Montpelier. Two lanes at 12' for 24' at narrowest on bridge.
Near
Williston until Oct 28. Beginning 4/18/22 on US 2A in Williston from Hurricane Ln. and easterly to VSP - Roadway and other highway related modifications with lane closure.
Near
Middlebury (village) until Jun 17. Beginning 4/11/22 on US 7 north of Dog Team Rd. in New Haven, bridge maintenance with a single lane closure for duration of project with temporary traffic light. Lane restriction of 13' at narrowest.
Near
Hyde Park until Oct 14. Johnson-Morristown, COARSE-MILLING, RECLAIMING, CORRECTING WITH INTERMEDIATE AND WEARING COURSES, PAVEMENT MARKINGS, GUARDRAIL, DRAINAGE IMPROVEMENTS. AND OTHER HIGHWAY RELATED ITEMS.
Near
East Brookfield until Jun 17. Beginning 03/23/22 Concrete repairs to the existing substructure. Utilizing flaggers the roadway will be reduced to one-lane during working hours only.
Near
Rockingham until Oct 21. Rockingham I-91 SB including exit 6 on ramp and southerly for approx. 4 tenth of a mile, stabilization of ledge which will include blasting, hand scaling, rock dowels and wire mesh. 11' lane restrict
Near
Swanton until Jun 24. Swanton-Highgate STP PS22 (3) Milling and Paving US-7 in Highgate in Swanton Project to start on 4/18 and finish 6/22
Near
Saint Johnsbury until Sep 15. Beginning 4/4/22 Ryegate to St. Johnsbury, Paving project on I-91NB between exits 15 & 21. Expect daytime alternating lane closures from travel lane to passing lane. Mon - Sat.
Near
West Brattleboro until Nov 18. VT Rte. 9 from approx. the Wilmington/Marlborough town line and extending to intersection of Edwards Hts. in Brattleboro, Pavement improvements. 12 foot lane restriction
Near
Woodstock until Nov 1. Effective 4/11/22 Just north of exit 2 in Sharon, I89 SB is closed utilizing a crossover to I-89 NB with a lane restriction of 14 feet at the narrowest.
Near
Hinesburg until Jun 30. Hunnington- Camels Hump Road - Replacement of existing bridge with a new bridge. One-way detour no signals - same as current condition, 11' width
Near
Lyndonville until Nov 3, 2023. The resurfacing of Interstate 91 NB, Lyndon - Barton NB MM 136.40 - NB MM 156.50, along with Exit Ramps 23, 24, and 25